Impact Window Permits in Broward County: How the Process Works

Do impact windows need a permit in Broward County? Yes. Replacing windows or doors requires a building permit issued by the property’s city building department—or Broward County for an unincorporated address. The permit must be issued before installation begins. Broward Impact manages filing, scheduling, and inspection coordination as part of every installation.

By Dave Meadors

Why the permit matters

A permit is the building department’s authorization to perform the work described in an approved application. It connects the selected products, opening schedule, and installation method to one reviewed record.

That review is not optional paperwork. Florida Statute 553.79 generally makes it unlawful to alter or repair a building without first obtaining the required permit from the proper enforcing agency. Replacement windows and exterior doors affect the building envelope and its resistance to wind and water, so they are permitted work—not an ordinary cosmetic repair.

It also records what the department approved, whether inspections passed, and whether the permit reached final status.

How the permit process works, step by step

1. Measure the openings and select the products

The process starts with field measurements and a product selection for each opening. Broward Impact installs ES Windows and CWS products. Every selected product carries a Miami-Dade Notice of Acceptance or Florida Product Approval appropriate to the proposed use.

Those documents are the technical foundation of the packet. They identify the product and its approved conditions of use. The opening schedule connects each product to a numbered opening at the house.

For more on what those documents prove—and what they do not—read our Florida product approvals and NOAs explainer.

2. Build and submit the permit application

The application goes to the building department with jurisdiction. A typical packet includes the application, scope and value of work, contractor information, opening or retrofit schedule, plans or floor-plan sketch, and applicable product approvals. The department may require other records.

Broward County’s checklist for unincorporated properties lists the permit application, plans, survey, product approvals, and Uniform Retrofit Window and Door Schedule. Municipal requirements differ, so each packet must follow the issuing city’s instructions.

Single-family home in Hollywood, Florida — the kind of property that goes through the permit process described on this page.

3. Record the Notice of Commencement when required

A Notice of Commencement, or NOC, is a public record used in Florida’s construction-lien process. It identifies the property, owner, contractor, and improvement. It is not the building permit.

The statutes contain two related thresholds. Under F.S. 713.13 and F.S. 713.02(5), a direct contract above $2,500 generally falls within the NOC provisions, and the owner or authorized agent records the NOC before work. Separately, F.S. 713.135(1)(e) requires the permitting authority to have the recorded NOC information before the first inspection when the direct contract exceeds $5,000. Broward County’s checklist uses $5,000 or more for window/door jobs.

The homeowner signs the NOC where required. Because lien-law and local filing instructions can depend on the project, follow the directions from the issuing building department and the project’s closing or legal professionals when applicable.

4. Plan review and permit issuance

The building department checks for completeness and code compliance. A reviewer may request a correction, clearer schedule, missing approval page, or revised product selection.

Approval time varies by city, workload, project scope, and whether the first submittal is complete. There is no honest universal day count for Broward County. When the review is complete and the required fees and administrative items are handled, the department issues the permit.

5. Installation begins only after issuance

For an ordinary window or door replacement, installation begins only after the permit is issued. Starting required work before issuance is a violation; filing an application is not permission to install.

The approved packet governs the work. If field conditions require a product, size, or installation change, that change may need building-department approval before the affected work continues.

6. The required inspections take place

The building department—or an authorized provider where allowed—checks the work against the approved documents and code. Inspection sequencing varies by jurisdiction and scope. Required details must remain visible and accessible.

An inspection is not a warranty or a transfer of installation responsibility to the city.

7. Final approval and permit closeout

The project is not finished administratively merely because the windows and doors are in place. Required corrections must be resolved, the final inspection must pass, and the permit must show closed or final status in the issuing department’s records.

Retain the closed permit, approved product documents, and installation records for future work, a sale, or a wind-mitigation inspection. For program requirements, see our My Safe Florida Home grant guide.

Who issues the permit?

The permit does not come from “Broward County” in every Broward County address. Each municipality operates or contracts for building-department services for properties within its jurisdiction. The property’s city building department ordinarily issues the permit. Broward County’s Building Code Division has permitting jurisdiction for unincorporated Broward County and certain contracted areas.

The property address determines jurisdiction. Confirm it before preparing the application. Broward County publishes municipal and unincorporated-area building contacts.

A permit, HOA approval, and a wind mitigation inspection are different

These are three separate gates:

Approval or inspectionWho handles itWhat it does
Building permitCity building department, or Broward County for an unincorporated addressAuthorizes the construction work and creates the inspection record.
HOA or condo approvalPrivate homeowners’ or condominium associationApplies the community’s governing documents and architectural rules. It does not replace a permit. See our HOA approval explainer.
Wind mitigation inspectionAn authorized mitigation inspector, after installationDocuments qualifying features on OIR-B1-1802 for the insurer. Insurers may apply credits after the inspection, and the insurer sets the amount. See our wind mitigation inspection explainer.

An association may approve a style the building department has not yet approved for construction, and a city permit does not waive association rules. Homeowners may need both before installation.

Why unpermitted window or door work creates problems

Unpermitted work leaves the homeowner without an approved construction record or passed final inspection. The consequences depend on the jurisdiction and facts, but they can include:

  • Code enforcement. A building official can issue a violation or stop-work order. Continued noncompliance can lead to enforcement costs, fines, or liens under applicable law.
  • Corrective work. The owner may have to apply for an after-the-fact permit, provide documents, expose concealed installation details, make corrections, replace noncompliant products, or remove work that cannot be approved.
  • Resale questions. A missing permit or open violation can surface during seller disclosures, buyer inspections, appraisal review, title work, or municipal lien searches. It does not create one automatic outcome, but it can delay or complicate a transaction.
  • Wind-mitigation documentation. Missing permit and product records can make it harder for a mitigation inspector to verify installed features. Insurers may apply wind-mitigation credits after an inspection on OIR-B1-1802, and the insurer sets the amount.

A retroactive permit is not a guaranteed paperwork cure. The building department may require evidence that is difficult to obtain after the openings have been finished.

Broward Impact Window & Door

What Broward Impact handles

Broward Impact manages permit filing, scheduling, and inspection coordination as part of every installation. Permit fees vary by city and are included on the written quote; typical installed ranges are on the impact windows cost guide for Broward County. That includes assembling the product approvals and opening schedule, submitting the packet to the correct building department, responding to permit comments related to the installation, and coordinating the required inspections and closeout.

The homeowner’s role is usually to provide required signatures—including the permit application or NOC when applicable—and provide access for scheduled inspections. If an HOA or condo approval is required, that remains a separate private approval even when its timing overlaps with permitting.

Frequently asked questions

Do I need a permit to replace windows with impact windows in Broward County?

Yes. Window and exterior-door replacement is permitted work. The proper city building department issues the permit for a municipal address; Broward County handles unincorporated addresses and certain contracted jurisdictions.

Who pulls the permit—the homeowner or the installer?

Broward Impact manages the permit process as part of every installation. The homeowner supplies required signatures and information. An owner-builder process exists in Florida, but it carries different responsibilities and is not how Broward Impact manages its contracted installations.

How long does permit approval take?

It varies by city, current workload, project scope, and application completeness. A correction request also changes the schedule. A fixed countywide day count would be misleading.

What happens if windows were installed without a permit?

Contact the building department with jurisdiction before doing more work. It may require an after-the-fact permit, documentation, inspections, corrections, exposure of concealed work, or removal of work that cannot be approved. Requirements differ by case and city.

Does HOA approval replace the city permit?

No. HOA or condo approval is private authorization under community rules. A building permit is government authorization under the building code. A project may require both.

What is a Notice of Commencement?

It is a recorded document in Florida’s construction-lien system that identifies the property, owner, contractor, and improvement. It is separate from the permit. Different statutory thresholds govern the general NOC provisions and when a permitting authority must have the recorded information before inspection.

Get Your Free In-Home Estimate

"*" indicates required fields

Schedule a free in-home estimate with Broward Impact Window & Door.

Licensed CGC 1514968.

Broward Impact Window & Door · 1954 Tigertail Blvd, Dania Beach, FL 33004 · 954-922-0606 · Hours: Mon–Fri 8:30 AM–6:00 PM, Sat 10:00 AM–2:00 PM, Sun closed.